Vertical circulation type parking equipment
Applications
Applicable to above-ground parking lots such as residential areas, shopping malls, hospitals, office buildings, government agencies, etc.
Features
1. The parking area of two vehicles can park 12-22 vehicles.
2, one-button operation, no special management is required.
3, you can choose the direction of rotation, automatically turn the head, easy to enter and exit the garage.
Plane-moving parking equipment
Determine the location of the entrance and exit according to the site conditions
Equipment introduction
Plane mobile parking equipment refers to mechanical parking equipment that moves vehicles on the same floor with a moving trolley or crane plane or traverses the plane of the vehicle board to access the parked vehicles.
Working principle
The lift of the plane mobile mechanical parking equipment is vertically lifted and moved from the entrance handling vehicle to different levels, and then the carrier transports the vehicle along the track in the passage to each parking space or the vicinity of the elevator at a high speed, and the access exchange mechanism of the carrier is used. The vehicle is exchanged between the carrier and the parking space, or between the carrier and the elevator to complete the access process.
Features and advantages
Lifting and traversing simultaneously, minimizing warehousing time
Increase parking space according to site size
Advanced electrical control devices to save energy
Project Cases
Project Name: Dalian North Station Project
Project address: Dalian North Station Square
Brief description of the project: This project is located in the north side of Dalian Station North Square Light Rail Station. The total construction area is about 4,300 square meters. The largest tower of Dalian is composed of 14 single garages. It fully realizes product modularization and standardization. Intelligent and become a local landmark.
Project Name: Zhongxiang Municipal Committee Courtyard
Project address; Hubei Zhongxiang Municipal Committee
Brief description of the project: The construction of this project was completed in August of 17th. After the completion of the project construction, the problem of parking difficulties in the municipal party committee was solved, so that each car had its own “home”. The community road became wider. People's mood is also better. It has been used normally, and it is convenient and quick to pick up the car, no noise.